Stainless Steel In-wall Thermostatic 3-function Shower Fixture/Kit
Specification
Top shower | SS, L500×W200mm, 4 functions (rain, mist, water column, waterfall) |
Mixer | brass, thermostatic 3-function, 4-shift diverter, with plastic box. 2mm thick SS plate. |
Shower bracket with outlet | brass |
Hand shower | brass |
Spout (CST30001) | brass, rotatable |
Flexible hose | 1.5m PVC |
Details
Product Advantages
1. The in-wall shower kit set is with a chromed finish.
2. There are different colors for the consumers to choose so as to meet the special demands.
3. Thermostatic 3-function mixer is embedded before construction and with one-key converting of different functions.
4. It has precise and consistent temperature control and prevents hot and cold contrast.
5. The wall hung top shower head is fixed with four functions - rain spray, mist, water column and waterfall.
6. One water-way inlet realizes four functions in the top shower, reducing labour cost.
7. The matching spout, shower bracket with outlet and hand shower can be individually installed according to the consumers' habit.
Production Process
Body:
Main plate selection ==> laser cutting ==> high precision laser cutting ==> bending ==> surface grinding ==> surface fine grinding ==> painting / electroplating ==> assembly ==> sealed waterway test ==> high and low temperature performance test ==> comprehensive functions test ==> cleaning and inspection ==> general inspection ==> packaging
Main Parts:
Brass selection ==> refined cutting ==> high precision CNC processing ==> fine polishing ==> painting / advanced electroplating ==> inspection ==> semi-finished parts for storage pending
Attentions
1. Some of the parts are individually packaged (such as top shower, hand shower etc.), so consumers need to install them partly. Please read the installation instructions before installing so as to avoid bumping in the process and affect the overall appearance, and pay attention to the sealing of relevant waterway connection parts.
2. During the initial installation, pay attention to the sealing of relevant waterway connection parts, and the accuracy of the installation of hot and cold water pipes and other functional waterways. Read the intruction carefully.
3. When the construction of the in-wall waterways is completed, and after cleaning up the existing sewage, the overall waterway sealing test and related functional tests are carried out to ensure that the waterway is well sealed and the function is accurate.
4. When using this product, the surface should not be touched by corrosive materials and should avoid hitting sharp objects to maintain the overall appearance.
5. Pay attention to the cleaning of the waterways, so as not to block the pipeline and the silicone nipples.
6: If the silicone nipples are blocked or the waterline is crooked after being used for a long time, please use a hard plastic sheet to squeeze and scrape the surface slightly to clean up the irregular scale attached to and around the hole. if there is intractable blockage, you can use brushes or plastic jumping needles with diameters not bigger than the outlet hole to clean and make the water outlet function normal.
Factory Capacity
Certificates